Home / Services / Bathrooms

Turn your bathroom into a space you'll love

Expert renovation and design that blends style, function and craftsmanship, from powder rooms to master ensuites across Durham Region, Kawartha and Northumberland.

Get your free estimate

Free design included. We aim to reply within 24 hours.

  • From $10,750Master ensuites often start near $27,000
  • 1–2 weeksTypical design-to-install time
  • Built to codeOntario Building Code standards
  • Free designCustom plan before you commit

What we offer

From a simple refresh to a full ensuite rebuild, these are the services we offer.

Complete bathroom remodels

Full renovations from demo to final finish, with every trade coordinated.

Custom showers

Walk-in showers, tub-showers and inserts, with benches, rain heads, niches, glass enclosures and curbless entries. Shower renovations typically run $5,500 to $9,000.

Waterproofing

Full waterproofing behind the tile using certified Schluter systems.

Tile installation

Ceramic, porcelain and natural stone on floors, walls and ceilings, including large-format, mosaic and herringbone accents. Typically $14 to $25 per sq ft.

Custom and prefab vanities

Double sinks, drawers, charging ports, LED mirrors and undermount sinks. Installed vanities typically run $1,350 to $2,700.

Master ensuites

Larger layouts with freestanding tubs, heated floors and upgraded finishes, typically starting around $27,000.

Powder rooms and basement bathrooms

Compact rooms and waterproof flooring done properly, including basement bathroom rough-ins.

Lighting and ventilation

Pot lights, vanity lighting and a quiet exhaust fan vented outside.

Step by step

How your bathroom comes together

Bathrooms are the least forgiving room to get wrong, since the water resistant layers are invisible once the tile goes up. Here is the order that protects them.

12 stages, start to finish

  1. 01
    Planning

    Design & planning

    We lock in the layout, shower configuration, tile choices and fixtures, and plan exactly how the room will be waterproofed. Once tile is set, changing your mind gets expensive fast.

  2. 02
    Coordination

    Trade coordination

    Plumber, electrician and tile setter are scheduled in sequence, and a permit is pulled if fixtures are moving. Bathrooms have the tightest trade choreography of any room in the house.

  3. 03
    Procurement

    Ordering & procurement

    Tile, vanity, tub or shower base and fixtures are ordered now. Shower glass is deliberately ordered later, since it needs to be measured against the finished, tiled opening.

  4. 04
    Demolition

    Demolition

    The room is stripped to the studs and subfloor, old tile, tub and vanity removed, so we can see the actual condition of the framing and plumbing underneath.

  5. 05
    Rough-in

    Rough-in plumbing & electrical

    Drain and supply lines are moved or added for the new layout, and wiring is run for vanity lighting, the exhaust fan and heated floor cable, all while the walls are still open.

  6. 06
    Structural

    Framing & subfloor prep

    Any shower curb or bench is framed, and the subfloor is levelled and reinforced so tile doesn't crack under the extra weight and moisture.

  7. 07
    Protection

    Waterproofing

    A bonded waterproofing membrane is applied to every shower wall, the floor and any niche, before a single tile goes up. This layer is what actually keeps water out of your walls for good, so it never gets rushed.

  8. 08
    Finishes

    Tile installation

    Floor tile, shower walls, niches and any feature walls are set once the waterproofing has cured, working from a laid-out pattern so cuts land in the least visible spots.

  9. 09
    Installation

    Vanity & cabinetry install

    The vanity cabinet and toilet are set in position now that the tile floor is finished underneath them.

  10. 10
    Installation

    Countertop & shower glass

    The vanity top is templated and installed, and shower glass is measured and fitted last, since it has to match the exact tiled opening, not the original drawing.

  11. 11
    Final finishes

    Fixtures, lighting & hardware

    Faucets, the shower system, mirror, light fixtures and towel bars go on last, once nothing above them can still get damaged or dusty.

  12. 12
    Complete

    Touch-ups, cleaning & final walkthrough

    Grout lines and caulking get a final check, the room is deep cleaned, and we walk it with you before it's signed off.

Illustrative sequence — icons represent each construction stage. Real project photos appear throughout the rest of this page.

Working with us

What it's like working with Ramsauer

The short version of what to expect on your bathroom project, beginning to end.

  • Clear scope & pricingWritten, itemized quotes. No surprise costs. See a sample →
  • Organized schedulingA clear timeline before work ever starts.
  • Coordinated subs & tradesEvery trade booked and managed for you.
  • Regular communicationOngoing updates, always reachable.
  • Clean, respectful job sitesTidy daily. Respectful of your home.
  • Quality controlChecked at every stage, not just the end.
  • Final walkthroughWe review the finished work together.
  • Warranty & supportTwo-year warranty. Still here after.

Recent bathroom work

Job photos from recent projects in Ajax, Courtice and Whitby. Open any photo to enlarge it.

View the full gallery

Choosing materials

Bathroom materials, compared

Cost, durability, upkeep and lifespan side by side, so you can choose with confidence.

Showers: acrylic, fibreglass or tile

The biggest choice in most bathrooms is how the shower is built.

Illustrative swatch

Acrylic

Easiest care
Installed cost
$2,700–$5,500
per shower
DurabilityTough, but can scratch or flex
Easy careSeamless and non-porous; no grout
Expected life15–25 years
Best for

Quick renovations, tub-to-shower conversions and secondary baths

Watch-outs

Limited sizes and styles; less custom

Illustrative swatch

Fibreglass

Lowest cost
Installed cost
$1,350–$3,150
per shower
DurabilityThin gel coat can scratch, dull or crack
Easy careWipe clean; gel coat can fade
Expected life10–15 years
Best for

Lowest-cost refresh or rental units

Watch-outs

Shortest life of the three; can crack over time

Dark chevron porcelain tile shower with dual rain heads and a lit nicheFrom our work

Tile

Most durableLongest life
Installed cost
$5,500–$10,750+
per shower
DurabilityVery durable when waterproofed properly
Easy careGrout needs cleaning and sealing
Expected life30–50+ years
Best for

Walk-in showers, niches, benches and any custom design

Watch-outs

Higher cost and longer install; the waterproofing behind it matters most

Rule of thumb. Choose tile for a custom or walk-in shower. Choose acrylic when speed and low upkeep matter more than design flexibility.

Approximate installed cost per shower (typical 3×5 ft), including waterproofing. Fixtures are extra. Costs are approximate installed prices for Durham Region and the GTA (CAD) and vary with product, size and site conditions. They are for comparison only. Your free design and written, itemized quote will give you exact numbers.

Not sure which is right for your bathroom?

We will walk you through the options at your site visit and price them side by side, so you can see exactly what each choice does to your budget.

Straight talk on cost

Renovation pricing, explained

What drives the price of a bathroom renovation, where you can save, and where cutting corners costs you more later. No jargon and nothing hidden.

Where the money typically goes

A rough split for a typical bathroom project. Every job is different, and your itemized quote shows your own numbers.

  • Labour (demo, tiling, install)38%
  • Tile and waterproofing materials16%
  • Plumbing fixtures and glass16%
  • Vanity, top and mirror12%
  • Electrical, lighting and ventilation8%
  • Permits and disposal10%

What Makes This Project Expensive?

The biggest cost drivers

  1. 1
    Tile work and waterproofingHigh impact

    Custom layouts, niches and benches take many skilled hours, plus a full waterproofing system behind the tile.

  2. 2
    Moving plumbingHigh impact

    Relocating the toilet, shower or tub means opening floors and changing drain and vent lines. It is often the biggest hidden cost.

  3. 3
    Shower size and glassMedium impact

    Frameless glass, curbless entries and large walk-in showers cost more to build and to enclose.

  4. 4
    Heated floors, fans and lightingMedium impact

    In-floor heat, GFCI circuits, quiet exhaust fans and recessed lights add materials and inspection work.

  5. 5
    Fixtures and finishesMedium impact

    Freestanding tubs, wall-hung and smart toilets, and designer faucets range from hundreds to thousands each.

Where Can I Save Money?

Smart ways to spend less

  1. 1
    Keep fixtures where they are

    Same-location toilet, tub and vanity means far less plumbing and framing work.

  2. 2
    Use standard tile sizes

    Straight-lay patterns install faster than herringbone or mosaics. Save the feature tile for one wall.

  3. 3
    Spend on the shower, save on the floor

    Put your budget where you see and use it, and choose a simpler floor tile.

  4. 4
    Choose a stock vanity

    A quality stock vanity and top costs far less than custom cabinetry and looks great.

  5. 5
    Refresh instead of gut

    If the layout works, new tile, vanity and fixtures on the existing footprint can transform the room.

Where Should I NOT Cheap Out?

Where quality pays for itself

  1. 1
    The waterproofing system

    A bonded membrane behind the tile keeps water out of your framing. Failures show up years later as leaks, mould and rebuilds.

  2. 2
    Shower slope and drain

    Correct slope prevents standing water, grout failure and odours.

  3. 3
    Ventilation

    A properly sized fan ducted outside prevents mould, peeling paint and rot.

  4. 4
    Valves and cartridges

    They live behind the tile. Replacing a cheap one later means opening the wall.

  5. 5
    A flat, solid surface for tile

    Uneven walls and floors cause cracked tile and uneven edges. Prep is not where to trim the budget.

Before you compare quotes, ask these four questions

Some of the biggest price gaps between contractors come from what is left out, not what is included.

  1. 1
    What allowances are included?

    Ask about tile, fixture and glass allowances. Are the amounts realistic for what you want?

  2. 2
    Are demo, disposal and permits in the price?

    These are real costs. Cheaper quotes sometimes leave them out.

  3. 3
    Is there a plan for hidden conditions?

    Old wiring, rot or damp can appear once walls open. Know how surprises are handled.

  4. 4
    Is every line itemized?

    A single lump sum makes it impossible to compare quotes fairly.

Every Ramsauer quote is written and itemized, so you can see all of this line by line before you commit.

Google ReviewsRamsauer Renovations
4.3

18 Google reviews

Rated 4.3 out of 5 by our clients on Google

What our clients say

Real reviews from real homeowners, straight from Google. Hover over (or tap) any review to pause it and read it in full.

Joe CherkasEnsuite bathroom · Google review

We worked with Ramsauer Renovations to enlarge and renovate our primary bathroom/ensuite. It was a wonderful experience from start to finish. From the initial meet and greet, the design consultation, to the breakdown of time line and prices, up the very end. Ramsauer renovations were a delight to work with. They were communicative, responsive and detail oriented. Demo days were quick and the crew always ended the day with vacuuming and cleaning their work area. They were respectable and mindful to the fact that we remained living in house during renos. They were very attentive to design details and you could tell they took pride in their craftsmanship. Ramsauer Renovations were reliable on time lines and pricing, their estimations also proved to be very accurate. We felt comfortable approaching them with any questions and concerns and never felt anxious about having them in our house unsupervised while we were at work. Overall this was a fantastic experience and we couldnt be happier with our new primary ensuite bathroom. We would definitely be turning to Ramsauer Renovations for any future projects and 100% recommend their services.

Emmanuel LopezBasement · Google review

Ramsauer Reno renovated my basement with top notch professional service. We received great quality service and communication quickly and they were easy to work with. Jim and his team were always willing to answer my questions or make a recommendation even after the work was completed. Every aspect of the project was done professionally with great products and great service. They were neat and clean. I have no hesitation in recommending Ramsauer Reno to anyone thinking of renovating their basement or home renovation. We will definitely be using Ramsauer Reno for our next home improvement project!

Curtis CobournBathrooms · Google review

Excellent work, they will work with you to ensure your project meets your needs and budget. Ramsaur Reno has renovated 2 bathrooms for me, extremely satisfied with both.

Common questions

Straight answers about pricing, permits and timelines. Anything else, just ask.

Ask us directly

How much does a bathroom renovation cost?

Most full bathroom remodels run about $10,750 to $22,500, while larger custom ensuites with upgraded finishes and heated floors typically start around $27,000. A shower renovation alone is usually $5,500 to $9,000. We give you an itemized written quote after a free design.

Do I need a permit to renovate my bathroom?

Cosmetic updates often don't need one, but moving plumbing, changing electrical or making structural changes usually does. Our work is completed to Ontario Building Code standards and we handle the permit process where it applies.

How long does a bathroom renovation take?

Design to installation is often in the 1–2 week range for a standard bathroom. Larger ensuites and custom tile work take longer, and we will give you a schedule with your quote.

What are the most popular upgrades?

Walk-in showers with glass enclosures, tile niches, double vanities, LED mirrors, heated floors and curbless showers for accessibility.

Can you renovate a master and a shared bathroom at the same time?

Yes. Doing both together saves on setup and mobilization, and we schedule the work so at least one bathroom is usable where possible.

Advice and ideas

How-to guides, design ideas and trends for your bathroom project.

How-to

4 min read

How to save money on a bathroom renovation without cutting corners

Six practical ways to keep the budget in check while still getting a bathroom built properly.

Read article
Design

4 min read

How to design a walk-in shower you will love

Glass, niches, benches, tile and drains. The details that make a shower feel custom and work every day.

Read article
Trends

3 min read

Bathroom trends we are watching for 2027

Spa-like calm, warmer finishes and smarter details are shaping the bathrooms homeowners ask for.

Read article

How we work

How your bathroom renovation works

A clear four-step process, from the first call to the final walkthrough.

  1. Step 01

    Fill out the form or call us

    Send the quick form or call. Tell us what you want to change about your bathroom.

  2. Step 02

    Site visit consultation

    We measure, talk through how you use the room, and note what you want to keep or change.

  3. Step 03

    Design and price

    We help you pick tile, vanity, fixtures and glass and draw the layout, with itemized pricing and timelines so you know the budget and schedule up front.

  4. Step 04

    Contract and build

    A clear contract, then quick demo days, plumbing and electrical rough-ins and proper waterproofing behind the tile. Many bathrooms take 1–2 weeks.

  • Free estimate
  • Free design
  • Written, itemized quote
  • 2-year warranty on all work

Ready to start your bathroom?