Home / Services / Kitchens

Custom kitchen renovations that add value to your home

From design to installation, we create kitchens that blend style, function and lasting quality across Oshawa, Whitby, Courtice and the wider Durham Region.

Get your free estimate

Free design included. We aim to reply within 24 hours.

  • From $13,500Typical range $13,500 to $40,500+
  • 2–3 weeksTypical time on site
  • Free designCustom layout before you commit
  • 2-year warrantyOn all work

What we offer

Whether you are refreshing the finishes or rebuilding the layout, this is what we can take on.

Full kitchen remodels

Open-concept layouts, moved or removed walls, and a new plan built around how you live.

Custom cabinetry and storage

Painted or stained cabinets, pantries, and smart storage with soft-close hardware.

Countertops

Quartz, granite and butcher block, cut and installed to fit tight.

Backsplash and tile

Subway, mosaic, herringbone or full-height slab backsplashes, set clean.

Lighting and electrical

Pot lights, pendants, under-cabinet lighting and new circuits where you need them.

Flooring

Hardwood, tile or vinyl plank installed level and continuous through the space.

Plumbing and fixtures

Sinks, faucets, dishwasher hookups and water lines, done to code.

Appliances and ventilation

Energy-efficient appliances, range hoods and the ductwork behind them.

Step by step

How your kitchen comes together

From an empty design board to a finished room, this is the order kitchens actually get built in, and why each step happens when it does.

12 stages, start to finish

  1. 01
    Planning

    Design & planning

    We finalize the layout, cabinet style, counter and floor selections, fixtures and appliance sizes. Every later trade is scheduled around these decisions, so this is where the real planning happens, not on-site.

  2. 02
    Coordination

    Trade coordination

    Electricians, plumbers and HVAC techs are booked around the cabinet delivery date. Kitchens involve more trades in a tighter space than almost any other room, so the schedule is locked before any tools come out.

  3. 03
    Procurement

    Ordering & procurement

    Cabinets, countertops, tile and appliances are ordered now, since cabinets alone can take 6 to 10 weeks to build. Ordering early means demo day isn't spent waiting on a truck.

  4. 04
    Demolition

    Protection & demolition

    Floors and doorways are protected, then old cabinets, counters, backsplash and flooring come out down to the studs and subfloor. This is also when we confirm what's really behind the walls.

  5. 05
    Rough-in

    Electrical, plumbing, HVAC & framing

    Outlets get moved for the new layout, gas and water lines are run for the range and sink, ductwork is adjusted, and any wall removal or beam work happens now, while everything is still open.

  6. 06
    Finishes

    Drywall, subfloor, tile & paint

    Walls are patched and painted, the subfloor is levelled, and floor tile goes down before the cabinets sit on top of it. Paint happens now so cabinets and counters never get splattered.

  7. 07
    Installation

    Cabinet installation

    Cabinet boxes are leveled, shimmed and screwed into the studs, then doors and drawers are fitted. Everything after this step is built around where the cabinets actually landed, not the drawing.

  8. 08
    Installation

    Countertop templating, fabrication & install

    A laser template is taken only after the cabinets are fixed in place, since a millimetre of movement matters. Stone is then cut off-site over 1 to 2 weeks before it's set and seamed on site.

  9. 09
    Finishes

    Backsplash tile

    Backsplash tile is set after the counter is in, so it can sit tight against the stone with a clean, consistent gap instead of guessing at a height.

  10. 10
    Finish carpentry

    Baseboards, trim & finish carpentry

    Toe kicks, end panels and any trim carpentry are fitted once the cabinets and counters define the exact lines to work to.

  11. 11
    Final finishes

    Fixtures, lighting, appliances & hardware

    The sink and faucet are hooked up, pendant lights and under-cabinet lighting are wired in, and the range, dishwasher and fridge are set and levelled. Cabinet hardware goes on last so it doesn't get scratched during install.

  12. 12
    Complete

    Touch-ups, cleaning & final walkthrough

    We fix any nicks, run a full clean, and walk the kitchen with you against the original plan before calling it finished.

Illustrative sequence — icons represent each construction stage. Real project photos appear throughout the rest of this page.

Working with us

What it's like working with Ramsauer

The short version of what to expect on your kitchen project, beginning to end.

  • Clear scope & pricingWritten, itemized quotes. No surprise costs. See a sample →
  • Organized schedulingA clear timeline before work ever starts.
  • Coordinated subs & tradesEvery trade booked and managed for you.
  • Regular communicationOngoing updates, always reachable.
  • Clean, respectful job sitesTidy daily. Respectful of your home.
  • Quality controlChecked at every stage, not just the end.
  • Final walkthroughWe review the finished work together.
  • Warranty & supportTwo-year warranty. Still here after.

Recent kitchen work

Job photos from recent projects in Whitby, ON. Open any photo to enlarge it.

View the full gallery

Choosing materials

Kitchen materials, compared

Cost, durability, upkeep and lifespan side by side, so you can choose with confidence.

Countertops: quartz, granite, laminate or butcher block

The surface you use most. Here is how the four most common choices compare.

Veined white quartz island top in a finished kitchenFrom our work

Quartz

Most durableEasiest care
Installed cost
$55–$130
per sq ft
DurabilityScratch, stain and chip resistant
Easy careNon-porous; no sealing needed
Expected life25–50 years
Best for

Busy family kitchens, islands and anyone who wants a consistent look

Watch-outs

Hot pans can mark the resin; heavy to install

Illustrative swatch

Granite

Most durableLongest life
Installed cost
$45–$120
per sq ft
DurabilityVery hard and heat resistant
Easy careSeal once or twice a year
Expected life30–50+ years
Best for

Natural stone lovers who want a one-of-a-kind slab and heat tolerance

Watch-outs

Porous without sealing; pattern varies slab to slab

Illustrative swatch

Laminate

Lowest cost
Installed cost
$20–$45
per sq ft
DurabilityChips, scratches and burns can't be repaired
Easy careWipe clean; keep water off the seams
Expected life10–20 years
Best for

Tight budgets, rentals and secondary kitchens

Watch-outs

Seams can swell if water sits; can't be refinished

Bamboo butcher-block counter with a bar sinkFrom our work

Butcher block

Installed cost
$30–$80
per sq ft
DurabilityDents and scratches, but can be sanded
Easy careOil regularly; keep it dry
Expected life20–30 years with care
Best for

Islands, bars and kitchenettes where warmth matters

Watch-outs

Water around sinks is its enemy; needs regular oiling

Rule of thumb. For most family kitchens, quartz is the best balance of price, durability and easy care. Choose granite if you love natural stone and don't mind sealing, or butcher block for a warm island or bar.

Approximate installed cost per sq ft of countertop, including fabrication and installation. Costs are approximate installed prices for Durham Region and the GTA (CAD) and vary with product, size and site conditions. They are for comparison only. Your free design and written, itemized quote will give you exact numbers.

Not sure which is right for your kitchen?

We will walk you through the options at your site visit and price them side by side, so you can see exactly what each choice does to your budget.

Straight talk on cost

Renovation pricing, explained

What drives the price of a kitchen renovation, where you can save, and where cutting corners costs you more later. No jargon and nothing hidden.

Where the money typically goes

A rough split for a typical kitchen project. Every job is different, and your itemized quote shows your own numbers.

  • Cabinets and hardware30%
  • Labour and installation20%
  • Appliances12%
  • Countertops12%
  • Plumbing, electrical and lighting10%
  • Flooring and backsplash8%
  • Design, permits and disposal8%

What Makes This Project Expensive?

The biggest cost drivers

  1. 1
    CabinetryHigh impact

    Usually the biggest single line. Custom sizes, full-height uppers, deep drawers and soft-close hardware all add up.

  2. 2
    Moving plumbing, gas or ventingHigh impact

    Relocating the sink, range or hood means opening floors and walls, new drain slopes and often a new vent path.

  3. 3
    Structural changesHigh impact

    Opening a wall can need an engineered beam, posts and permits before a single cabinet goes in.

  4. 4
    Electrical upgradesMedium impact

    Older homes often need new circuits, more outlets, under-cabinet lighting and panel capacity for wall ovens or induction.

  5. 5
    Stone counters and premium appliancesMedium impact

    Waterfall edges, big slabs and panel-ready appliances carry a real premium and need precise cabinet prep.

Where Can I Save Money?

Smart ways to spend less

  1. 1
    Keep the layout

    If the sink, range and fridge stay where they are, you skip most of the plumbing, gas and venting work.

  2. 2
    Mix cabinet levels

    Use semi-custom cabinets and spend on what you touch daily: drawers, pulls and the pantry.

  3. 3
    Keep what still works

    Sound existing cabinets can often be refinished, and good flooring or appliances can stay.

  4. 4
    Keep the backsplash simple

    Standard tile on the long runs, with one feature panel behind the range, gives the look for less.

  5. 5
    Decide before demo day

    Locking in finishes early avoids rush orders, change orders and delays.

Where Should I NOT Cheap Out?

Where quality pays for itself

  1. 1
    Cabinet boxes and hardware

    Water-resistant boxes and quality hinges and slides are used hundreds of times a day. Cheap ones sag and swell first.

  2. 2
    Ventilation

    A properly sized hood ducted outside removes grease, moisture and smoke. Weak or recirculating ones don't.

  3. 3
    Plumbing and leak protection

    Small leaks rot cabinets from the inside. Good supply lines, shut-offs and a level, sealed sink base are cheap insurance.

  4. 4
    Electrical work and permits

    Code-compliant circuits and inspections protect your safety, your insurance and your resale value.

  5. 5
    Layout and lighting design

    A plan that works and good task lighting cost little next to living with a kitchen that fights you every day.

Before you compare quotes, ask these four questions

Some of the biggest price gaps between contractors come from what is left out, not what is included.

  1. 1
    What allowances are included?

    Ask about cabinet, counter and appliance allowances. Are the amounts realistic for what you want?

  2. 2
    Are demo, disposal and permits in the price?

    These are real costs. Cheaper quotes sometimes leave them out.

  3. 3
    Is there a plan for hidden conditions?

    Old wiring, rot or damp can appear once walls open. Know how surprises are handled.

  4. 4
    Is every line itemized?

    A single lump sum makes it impossible to compare quotes fairly.

Every Ramsauer quote is written and itemized, so you can see all of this line by line before you commit.

Google ReviewsRamsauer Renovations
4.3

18 Google reviews

Rated 4.3 out of 5 by our clients on Google

What our clients say

Real reviews from real homeowners, straight from Google. Hover over (or tap) any review to pause it and read it in full.

Joe CherkasEnsuite bathroom · Google review

We worked with Ramsauer Renovations to enlarge and renovate our primary bathroom/ensuite. It was a wonderful experience from start to finish. From the initial meet and greet, the design consultation, to the breakdown of time line and prices, up the very end. Ramsauer renovations were a delight to work with. They were communicative, responsive and detail oriented. Demo days were quick and the crew always ended the day with vacuuming and cleaning their work area. They were respectable and mindful to the fact that we remained living in house during renos. They were very attentive to design details and you could tell they took pride in their craftsmanship. Ramsauer Renovations were reliable on time lines and pricing, their estimations also proved to be very accurate. We felt comfortable approaching them with any questions and concerns and never felt anxious about having them in our house unsupervised while we were at work. Overall this was a fantastic experience and we couldnt be happier with our new primary ensuite bathroom. We would definitely be turning to Ramsauer Renovations for any future projects and 100% recommend their services.

Emmanuel LopezBasement · Google review

Ramsauer Reno renovated my basement with top notch professional service. We received great quality service and communication quickly and they were easy to work with. Jim and his team were always willing to answer my questions or make a recommendation even after the work was completed. Every aspect of the project was done professionally with great products and great service. They were neat and clean. I have no hesitation in recommending Ramsauer Reno to anyone thinking of renovating their basement or home renovation. We will definitely be using Ramsauer Reno for our next home improvement project!

Curtis CobournBathrooms · Google review

Excellent work, they will work with you to ensure your project meets your needs and budget. Ramsaur Reno has renovated 2 bathrooms for me, extremely satisfied with both.

Common questions

Straight answers about pricing, permits and timelines. Anything else, just ask.

Ask us directly

How much does a kitchen renovation cost?

It depends on size, layout and finishes. Most kitchen remodels start around $13,500 and commonly run to $40,500, while custom kitchens with premium cabinetry, stone counters and high-end appliances can reach $54,000 or more. We give you a written, itemized price after a free design.

Do I need a permit for a kitchen renovation?

Not always. Simple upgrades like cabinets, counters and flooring usually don't need one. If your project involves plumbing, electrical or structural changes, permits are required so the work meets building code. We take care of that for you.

How long does a kitchen renovation take?

Most kitchens take about 2–3 weeks on site, depending on scope, design complexity and any surprises behind the walls.

What upgrades add the most value?

Custom cabinetry, modern counters, energy-efficient appliances and open layouts tend to give the best return.

Can I live at home during the renovation?

Yes, though your kitchen will be out of use for a while. Many homeowners set up a temporary kitchen with a microwave, kettle and small fridge in another room.

Advice and ideas

How-to guides, design ideas and trends for your kitchen project.

How-to

4 min read

How to plan a kitchen layout that actually works

Before you pick a single finish, get the layout right. Here is how we think about zones, aisles and storage.

Read article
Design

4 min read

Choosing cabinets, counters and backsplash that work together

A simple approach to mixing finishes so the kitchen looks intentional, not busy.

Read article
Trends

3 min read

Kitchen trends we are watching for 2027

Warmer materials, quieter appliances and smarter storage. Here is where kitchen design seems to be heading.

Read article

How we work

How your kitchen renovation works

Every kitchen follows the same four steps, so you always know what happens next.

  1. Step 01

    Fill out the form or call us

    Send the quick form or call. Tell us what you want from your kitchen.

  2. Step 02

    Site visit consultation

    We visit to measure, see how you cook and entertain, and hear your must-haves.

  3. Step 03

    Design and price

    A custom layout with cabinetry, counters, backsplash and lighting chosen with you, plus a written price with allowances line by line. No surprise add-ons.

  4. Step 04

    Contract and build

    A clear contract, with permits and ordering handled for you. Then demo through to a final walkthrough. Most kitchens take 2–3 weeks on site.

  • Free estimate
  • Free design
  • Written, itemized quote
  • 2-year warranty on all work

Ready to start your kitchen?