A plain-language guide to permits across Durham Region, with each municipality’s own rules and links to the source.

4.4 on Google · 20 reviews

By Michael Ramsauer, owner · Updated October 2026 · 8 min read

New rooms with drywall hung, taped and mudded, ready for sanding and paint

The short answer

In Durham Region you generally need a permit for structural work, new plumbing or drains, finished basements, additional dwelling units and most raised or attached decks. You generally don’t need one for cosmetic work like paint, flooring, cabinets or swapping a faucet. Each municipality issues its own permits and sets some of its own thresholds.

When you need a building permit

Building permits come from your local municipality, under the Ontario Building Code. Getting one means plans are reviewed and the work is inspected at key stages, which protects your safety, your insurance and your resale value. Unpermitted work can cause problems with insurers, lenders and buyers.

Usually needs a permitUsually doesn’t
Removing or adding walls, new window or door openingsPainting, flooring, trim
New plumbing or drains, moving fixturesReplacing a faucet, valve or water heater
Finishing a basement, walkouts, below-grade entrancesReplacing cabinets and counters in the same layout
Additional dwelling units (basement or backyard suites)Like-for-like window replacement (Oshawa, houses)
Most attached or raised decksLow, unroofed decks under local thresholds

Electrical work is permitted and inspected separately through the Electrical Safety Authority (ESA), usually by your licensed electrician.

Permit rules in each Durham municipality

Each town publishes its own guidance. Here’s what each one says, with a link to the source:

MunicipalityKey pointsSource
OshawaPermit for new or replacement decks (exempt: houses, no roof, ≤ 600 mm high); new or replaced plumbing systems; alterations affecting structure or systems; sheds over 10 m² or with plumbingCity of Oshawa
WhitbyPermit for decks over 24 in above grade, finished basements, walkouts, below-grade entrances, ADUs, structural changes, adding or removing walls, plumbing and heatingTown of Whitby
AjaxDecks and porches are minor construction; second units, below-grade entrances and renovations are moderate construction. Apply online at eapply.ajax.caTown of Ajax
PickeringEvery ADU needs a permit (even pre-approved designs) and registration under By-law 8040/23City of Pickering
Clarington (Courtice, Bowmanville, Newcastle)Permit for attached decks over 0.6 m above grade or any deck over 10 m²; $160.86 per deck; three inspectionsClarington
Scugog (Port Perry)Permit for structures over 15 m²; renovations, decks, sheds, plumbing listed; Health Department approval with septic, well report with a wellTownship of Scugog
UxbridgeSecondary suites: confirm with Development Services, get a permit, then register the two-unit houseTownship of Uxbridge

Rules change and every property is different. We confirm the current requirements for your address before work starts.

Permits by project: decks, basements, bathrooms and more

Kitchens

Same-layout cabinet, counter and flooring updates usually don’t need a permit. Moving plumbing, adding circuits or removing walls generally do.

Bathrooms

Cosmetic updates often don’t. Moving or adding plumbing, structural changes and new electrical usually do.

Basements

Finishing a basement generally needs a permit, and so do walkouts, below-grade entrances and any second unit. See our basement cost guide.

Decks

Most attached or raised decks need one, but thresholds vary by town. See the table above and our deck guide.

Fences

Usually covered by a fence by-law rather than a building permit, with height limits and special rules for front yards and pools.

How the building permit process works

  1. Check zoning. Setbacks, lot coverage and use. Some projects need a minor variance first.
  2. Prepare drawings. To scale, showing existing and proposed conditions. Suites and structural work often need a qualified designer or engineer.
  3. Apply online. Most Durham municipalities now take residential applications through an online portal.
  4. Build and inspect. Inspections happen at set stages, such as footings, framing, insulation and final.
  5. Close the permit. A closed permit is your record that the work was done to code.

When you hire Ramsauer Renovations, we prepare the drawings, submit the application and book the inspections as part of the job.

Questions

Quick answers.

Straight answers. Anything else, just ask.

Ask us directly

01Do I need a permit to finish my basement in Durham Region?

Generally yes. Whitby, for example, lists finished basements among the projects that need a permit, and any basement apartment needs one everywhere.

02Do I need a permit to replace my kitchen?

Not if you keep the layout and only replace cabinets, counters and flooring. Moving plumbing, adding circuits or removing walls usually does.

03Who applies for the permit, me or my contractor?

Either can, but most homeowners have the contractor do it. We prepare the drawings and handle the application and inspections.